BylawsBylaw No. 1160Community standardsAdopted 2008In force, as amended
Building Bylaw
Building work in Langford—from new construction and alterations to demolition, repairs and changes in occupancy—is subject to this bylaw’s rules on permits, owner responsibilities, inspections and compliance. Its sections also cover site services and access, pools, professional review, energy requirements, offences and penalties; appendices provide permit-fee schedules and technical drawings.
Who it affects: Owners and people planning or carrying out building or plumbing work covered by the bylaw in Langford.
Key rules
The parts residents most often run into. The PDF is the official text.
- Owners must obtain required permits or approvals and pay fees and deposits before work begins.
- Permit applications are filed online through the City of Langford EPR Portal.
- Owners must give at least 24 hours’ notice for required field inspections.
- An occupancy permit is required before occupancy after construction, partial demolition, alteration or a change in occupancy.
- A permit or City review does not remove the owner’s responsibility to comply with the bylaw and Building Code.
- Appendix A contains fee schedules; Appendix B contains technical drawings for drainage, sewer connections and driveway access.
At council
8 matters about this bylaw
- AdoptedApr 20, 2026
Zero Carbon Step Code requirements
New building rules set energy and emissions targets: Part 9 buildings must meet EL-2 for permits after July 1, 2026, and EL-4 after Dec. 1; Part 3 buildings must meet EL-4 after Dec. 1. Builders must submit compliance reports before construction and at occupancy.
Building bylaw amendment adopted Jun 1, 2026.
- AdoptedMar 3, 2025 – May 5, 2025
Building bylaw amendment
This amendment changes the city's building bylaw, which sets requirements for building work. The record does not explain the specific changes or how they may affect residents.
Bylaw adopted May 5, 2025.
- Jun 20, 2022
Langford building bylaw amendment
This amendment changes Langford’s building bylaw, which sets requirements for building work and permits. The available record does not describe the specific changes.
Listed for adoption Jun 20, 2022; the adoption outcome is not recorded.
- AdoptedMay 21, 2019 – Jun 4, 2019
Building bylaw amendment
This bylaw updates Langford’s building regulations. The available record does not describe the specific changes or their effects on residents.
Amendment adopted June 4, 2019.
- AdoptedJul 30, 2018 – Jul 31, 2018
Building permit fee schedule
The amendment replaces the Building Bylaw’s fee schedule, clarifying charges for building, plumbing, chimney, fire protection and other permits. These fees affect what property owners and builders pay when applying for permits.
Bylaw adopted Jul 31, 2018.
- AdoptedJul 16, 2018
Building bylaw amendment
This amendment changes Langford's building bylaw, which governs building requirements. The available record does not identify the provisions changed, so its practical effect on builders and residents is unclear.
Bylaw adopted July 16, 2018.
- Jun 8, 2017
Building bylaw amendment
An amendment to the city’s building bylaw was presented for adoption. The available records do not explain which building requirements would change or how the amendment would affect residents or builders.
Adoption listed Jun 8, 2017; no adoption decision is recorded in the available history.
- AdoptedMay 2, 2016 – May 16, 2016
Building bylaw amendment
The amendment updates building-related requirements and fees, but the records do not specify the individual changes or charges. It affects people applying for building permits or related city services.
Amendment adopted May 16, 2016.
Full textShowHide
CONSOLIDATED
BUILDING BYLAW 1160, 2008
List of Amendments
Consolidated for Convenience Only
This Bylaw has been consolidated as of June 1, 2026, for convenience only. Where applicable,
capitalization, numerical order, and numbering have been altered for consistency. Copies of the
original Bylaw and amendments may be viewed at the Langford City Hall located on the Second
Floor, 877 Goldstream Avenue, Langford, BC.
Consolidated to:
Amendment
Bylaw Number
Date Adopted
Amendment No.1, 2009
1210
20090202
Amendment No 2, 2009
1237
20090615
Amendment No. 3, 2010
1277
20100406
Amendment No. 4, 2014
1527
20140616
Amendment No. 5 - DRAFT
1528
DRAFT
Amendment No. 6, 2015
1560
20150407
Amendment No. 7, 2015 (access routes)
1598
20151102
Amendment No. 8, 2016 (replace Appendix A)
1634
May 16, 2016
Amendment No. 9, 2017 (replace Appendix A)
1706
June 8, 2017
Amendment No. 10, 2018 (replace Appendix A) -
REPEALED
1776
July 16, 2018
Amendment No. 11, 2018 (replace Appendix A)
1802
July 31, 2018
Amendment N0. 12, 2019 ((replace Appendix A)
1850
June 4, 2019
Amendment No 13, 2020 (replace appendix A)
1902
June 29, 2020
Amendment No. 14, 2021 (replace appendix A)
1966
July 19, 2021
Amendment No. 15, 2022 (replace appendix A)
2047
June 20, 2022
Amendment No. 16, 2025 (replace appendix A)
2121
May 5, 2025
Amendment No. 17, 2026
2181
March 16, 2026
Amendment No. 18, 2026
2283
June 1, 2026
City of Langford
Building Bylaw No. 1160, 2008 (Consolidated to June 1, 2026)
Page 2 of 32
CONSOLIDATED BUILDING BYLAW 1160, 2008
Table of Contents
Section
Page
1.0
Scope, Application and Definitions
4
1.1
Scope and Applications
4
1.2
Exemptions
4
1.3
Definitions
4-5
2.0
Responsibilities and Obligations
5
2.1
General Prohibitions
5-6
2.2
Obligations of the Owner
6-8
2.3
Administration and Enforcement
8-10
3.0
Permits and Permit Fees
11
3.1
Permits
11
3.2
Application for Permit
11-12
3.3
Approval in Part
13
3.4
Property Subject to Flooding
13
3.5
Energy Conservation and Greenhouse Gas Emission Reduction
14
4.0
Additional Requirements
13
4.1
Professional Inspection or Review
13
4.2
Inspection and Testing of Plumbing Systems
13
4.3
Excavations
13
4.4
Crest Requirements
14
5.0
Requirements for Site Services and Access
14
5.1
General
14
5.2
Sewer Systems Within Sewer Specified Areas
14-15
5.3
Access Routes
16-17
6.0
Pools
17-18
7.0
RESERVED
18
8.0
Second One Family Dwelling
18
9.0
Design Data
18-19
10.0
Offences and Penalties
19
10.1
General
19
City of Langford
Building Bylaw No. 1160, 2008 (Consolidated to June 1, 2026)
Page 3 of 32
APPENDIX A
Section
Page
A.
General
21
B.
Scale of Fees – Building Permits
22
C.
Scale of Fees- Plumbing Permits
23-24
D.
Scale of Fees – Chimney, Fireplace and Solid Fuel
24
Burning Appliance Permits and Oil Burning Equipment
APPENDIX B
Figure
Page
BD1
Stormwater Drainage System for Single
25
Family Dwellings – No Municipal Storm
Drainage System
BD2
Typical Foundation and Storm Drainage System
26
BD4
Standard Infiltrator Drainage System
27
with Municipal Storm Drainage System
SS S9
Inspection Chamber Sanitary/Storm Sewer Connection
28
BD-05
Typical Driveway Access Cross Sections
29
For Urban Road – Detail A & B
BD-06
Typical Driveway Access Cross Sections
30
For Urban Road – Detail C & D
BD-07
Typical Driveway Access Cross Sections
31
For Rural Road
City of Langford
Building Bylaw No. 1160, 2008 (Consolidated to June 1, 2026)
Page 4 of 32
CITY OF LANGFORD
BYLAW NO. 1160
[This Bylaw has been consolidated for convenience only. Where applicable, capitalization,
numerical order, and numbering have been altered for consistency. Copies of the original
Bylaw and amendment may be viewed at the Langford City Hall located on the 2nd Floor, 877
Goldstream Avenue, Langford, BC]
A BYLAW FOR THE ADMINISTRATION AND ENFORCEMENT OF THE BUILDING
CODE
A.
The Council of the City of Langford in open meeting assembled, enacts as follows:
1.0
SCOPE, APPLICATION AND DEFINITIONS
1.1
SCOPE AND DEFINITIONS
1.1.1
This bylaw applies to the design, construction and occupancy of new buildings, and
the alteration, reconstruction, demolition, removal, relocation, repair and change in
occupancy of existing buildings, including any work being done pursuant to an order
to eliminate an unsafe condition in the building.
1.1.2
Where a building or any part of it is altered, this bylaw applies to the parts of the
building that are altered.
1.1.3
Notwithstanding any other requirements in this bylaw, this bylaw also applies to:
(a)
the design and construction of a structure designed to support a radio
transmission antenna;
(b)
free standing fireplaces, unused solid fuel burning appliances or incinerators
not constructed in conjunction with a building that would otherwise require a
permit,
(c)
the construction or alteration of a fence that encloses a swimming pool or pool
ladder or access point, and
(d)
plumbing systems being installed outside of buildings on private property.
1.2
EXEMPTIONS
1.2.1
Except as otherwise provided for in this bylaw, this bylaw does not apply to buildings
referred to in s.1.1.1.1(2)(a) thru (h) of the British Columbia Building Code.
1.3
DEFINITIONS
1.3.1
The words and terms in this bylaw shall have the meanings prescribed in the current
British Columbia Building Code unless otherwise defined in s.1.3.3.
1.3.2
Definitions of words and phrases used in this bylaw that are not specifically defined in
the current British Columbia Building Code or s.1.3.3 shall have the meanings which are
commonly associated with them in the context in which they are used in this bylaw,
taking into account the specialized use of terms within the various trades and
professions in which the terminology is used.
1.3.3
In this Bylaw:
City of Langford
Building Bylaw No. 1160, 2008 (Consolidated to June 1, 2026)
Page 5 of 32
“AS-BUILT COMPLIANCE REPORT” means a standardized report that demonstrates
that the completed building complies with the Energy Step Code and Zero Carbon Step
Code requirements under section 3.5 of this bylaw, in a form acceptable to the Chief
Building Official.
"BUILDING CODE" means the "British Columbia Building Code" adopted under the
British Columbia Building Code Regulation, and the Water Conservation Plumbing
Regulation.
"DWELLING UNIT" means a room or group of rooms operated as a housekeeping unit,
used or intended to be used as a domicile by one or more persons and usually
containing cooking, eating, living and sanitary facilities.
"CHIEF BUILDING OFFICIAL" means the person appointed to that position by the
Council of the City of Langford and any other employee of the City authorized by the
Council to act on behalf of the Chief Building Inspector.
“CITY ENGINEER” means the company, person or persons appointed from time to time
by the Council to act in that capacity, and any other employee of the City authorized to
act on behalf of the City Engineer.
“CLERK-ADMINISTRATOR” means the person appointed to that position by the Council
of The City of Langford and any other employee of the City authorized by the Council to
act on behalf of the “Clerk-Administrator.
“COMPLIANCE REPORT” means a standardized report that demonstrates that the
building complies with the Energy Step Code and Zero Carbon Step Code requirements
under section 3.5 of this bylaw, in a form acceptable to the Chief Building Official.
“EMISSION LEVEL” means the greenhouse gas emission level as described in Article
9.37.1.3 of Division B for buildings regulated under Part 9 of the Building Code and
Article 10.3.1.3 of Division B for buildings regulated under Part 3 of the Building Code.
“ENERGY STEP CODE” means the system of energy performance requirements set out
in Division B, Parts 9 and 10 of the Building Code.
“LANGFORD GIS MAPPING SYSTEM” means the data provided by the Langford
geographic information system and publically available on the City’s website for viewing
in map form.
“MASTER MUNICIPAL CONSTRUCTION DOCUMENTS” means the Specifications
and Standard Detail Drawings in Volume II of the most recent Master Municipal
Construction Documents published by the Master Municipal Construction Documents
Association.
“MEDICAL HEALTH OFFICER” means the Medical Health Officer for the Vancouver
Island Health Authority.
“ONE FAMILY DWELLING” means a building containing only one dwelling unit, or one
dwelling unit and an accessory secondary suite.
“OWNER” means any person, firm or corporation controlling the real property under
consideration and includes an agent of the owner.
“PRE-CONSTRUCTION COMPLIANCE REPORT” means a standardized report that
demonstrates that the building, as designed, complies with the Energy Step Code and
BL 1527
18Jun2014
BL 1598
02Nov2015
City of Langford
Building Bylaw No. 1160, 2008 (Consolidated to June 1, 2026)
Page 6 of 32
Zero Carbon Step Code requirements under section 3.5 of this bylaw, in a form
acceptable to the Chief Building Official.
“SOIL DEPOSITION BYLAW” means the City of Langford Bylaw No. 181.
"TWO FAMILY DWELLING " means a building other than a building containing a
secondary suite, containing two dwelling units.
“ZERO CARBON STEP CODE” means the system of greenhouse gas emission level
requirements set out in Division B, Parts 9 and 10 of the Building Code.
“ZONING BYLAW” means the City of Langford Zoning Bylaw No. 300.
“SUBDIVISION AND DEVELOPMENT SERVICING BYLAW” means City of Langford
Subdivision and Development Servicing Bylaw No. 1000.
2.0
RESPONSIBILITIES AND OBLIGATIONS
2.1
GENERAL PROHIBITIONS
2.1.1
No person shall fail to comply with any Stop Work notice, or any order or notice issued
by the Chief Building Official.
2.1.2
No person shall work or authorize or allow work to proceed on a project for which a
permit is required under this bylaw unless a permit authorizing the work has been issued.
2.1.3
No person shall construct, install, extend, alter, renew or repair a plumbing system or
connect a plumbing system to a city sewer, drain or water service unless a plumbing
permit authorizing the work has been issued, but a plumbing permit is not required when
a valve, faucet, fixture or service water heater is repaired or replaced, a stoppage is
cleared or a leak is repaired if no change to the piping is required.
2.1.4
No person shall construct a new building, or alter, reconstruct, demolish, remove, repair
or relocate an existing building unless a building permit authorizing the work has been
issued, but no permit shall be required for the replacement of roofing materials or
exterior cladding.
2.1.5.
No person shall install a fireplace, incinerator, oil burning furnace or solid fuel burning
appliance or construct a chimney unless a permit authorizing the work has been issued,
or move a building having masonry fireplace or chimney without dismantling the fireplace
or chimney and reconstructing it after having obtained a permit authorizing the work.
2.1.6
No person shall deviate from the plans and specifications forming a part of the building
permit, or omit or fail to complete, prior to occupancy, work required by such plans and
specifications accepted by the Chief Building Official without first having obtained in
writing the approval of the Chief Building Official.
2.1.7
No person shall occupy or allow the occupancy of any building, or part thereof, unless
the owner has obtained an occupancy permit from the Chief Building Official
2.1.8
No person shall excavate or undertake work on, over or under public property, or erect or
place any construction or work or store any materials on public property without
approval having first been obtained under the Streets and Traffic Bylaw No. 2233, 2025.
2.1.9
No person shall alter or allow the ground elevations of a building lot to be altered so as to
place a building, or part thereof, in contravention of this bylaw, the Soil Removal and
City of Langford
Building Bylaw No. 1160, 2008 (Consolidated to June 1, 2026)
Page 7 of 32
Deposition Bylaw or the Zoning Bylaw unless the ground elevations are altered after
obtaining the necessary permit.
2.1.10
No person shall knowingly submit false or misleading information in connection with an
application for a permit required by this bylaw.
2.1.11 No person shall reverse, alter, deface, cover, remove or in any way tamper with any
notice, permit or certificate issued pursuant to this bylaw and posted on any building.
2.1.12 No person shall prevent or obstruct or attempt to prevent or obstruct entry of the Chief
Building Inspector or any other City employee authorized to enter upon property under
the Community Charter to inspect and determine whether this bylaw is being
contravened.
2.2
OBLIGATIONS OF THE OWNER
2.2.1
Every owner shall obtain all required permits or approvals, and pay all fees and provide
all deposits prior to the commencement of work regulated by this bylaw.
2.2.2
It is the owner's obligation to provide assurance that the water, sewer and other services
are available and at adequate depth to serve the proposed building and that the
plumbing is constructed to meet these services.
2.2.3
Every owner shall ensure that:
(a)
the plans and specifications on which the issuance of the building permit was
based are available at the site of the work for inspection during working hours
by the Chief Building Inspector: and
(b)
a temporary address sign, with numbers not less than 152mm (6”) in height,
visible from the road, and maintained at all times is erected at the site of work
authorized by this bylaw.
2.2.4
Every owner shall, prior to commencing the work, give notice in writing to the Chief
Building Official of:
(a)
the name, address and telephone number of:
(i)
the constructor or other person in charge of the work,
(ii)
the suitably qualified person inspecting the work, and
(iii)
any inspection or testing agency engaged to monitor the work, and
(b)
any change in or termination of employment of such persons during the course
of the construction as soon as such change or termination occurs.
2.2.5
Except in the circumstances set out in Section 2.2.6, every owner shall give at least 24
hours notice to the Chief Building Official and obtain a field inspection of the work:
(a)
after the forms for footings and foundations are complete, but prior to placing of
any concrete;
(b)
after removal of form work from a concrete foundation and installation of
perimeter drains and damp-proofing, but prior to backfilling against foundation;
(c)
after the installation of the under-slab insulation;
(d)
when framing and sheathing of the building are complete, including fire-
stopping, bracing, chimney, duct work, plumbing, (including radiant and
hydronic heating systems) gas venting, wiring, but before any insulation, lath or
other interior or exterior finish is applied which would conceal such work;
(e)
after the “Second Plane of Protection”, as described in the Building Code, has
been installed and before any portions of the “First Plane of Protection” is
installed;
(f)
after insulation and vapour barrier have been installed and before any interior
City of Langford
Building Bylaw No. 1160, 2008 (Consolidated to June 1, 2026)
Page 8 of 32
wall finish is applied;
(g)
after the installation of drywall for fire separation in buildings containing
secondary suites, multiple residential and multiple commercial occupancies and
before any drywall taping or filler is applied;
(h)
after the application of sheathing paper and wire lath;
(i)
after the first stucco scratch coat;
(j)
before a building drain, sanitary or storm sewer is covered and when
considered necessary, underground building drains, branches, storm drains and
sewers shall be retested after the completion of all backfilling and grading by
heavy equipment in the presence of the Chief Building Official;
(k)
after the installation of the smoke damper of a fireplace and prior to the
installation of the first flue liner or any material that would conceal the details of
the construction of the fire box and smoke chamber;
(l)
after the building or portion thereof is complete and ready for occupancy, but
before occupancy takes place of the whole or a portion of the building;
(m)
in the case of a building demolition, after the completion of the demolition; and
(n)
after any building is disconnected from City services.
2.2.6
The inspections listed in Section 2.2.5 are not required in relation to work in respect of
which Letters of Assurance in the form set out in the Building Code are being provided to
the Chief Building Official, but in such circumstances the Chief Building Official may
attend at the site of the work from time to time to monitor the conduct of the work and the
conduct of field reviews by the registered professional, and may require the registered
professional to provide copies of field review reports at the time the reports are prepared
or, at the Chief Building Officials discretion, upon completion of the work and prior to the
issuance of an occupancy permit.
2.2.7
Every owner shall give notice in writing to the Chief Building Official
(a)
as soon as any change in ownership or change in the address of the owner
occurs between the date of issuance of a building permit and the date of
application for an occupancy permit, and
(b)
prior to occupying any portion of the building if it is to be occupied in stages.
2.2.8 (1) Every owner shall provide to the Chief Building Official, an up-to-date building location
survey by a British Columbia Land Surveyor after the foundation is completed and prior
to framing. The survey shall be provided in both electronic and paper format. The
electronic format shall be provided as an AutoCAD drawing file or a compatible DXF file.
The plan shall show the location of the building foundations in relation to the lot
boundaries, geodetic floor elevations and all easements and rights-of-way.
(2) Every owner shall provide to the Chief Building Official, height surveys of the building by
a British Columbia Land Surveyor at such stages of construction as are required by the
Chief Building Inspector to confirm compliance with the Zoning Bylaw. The heights shall
be given in geodetic elevations conforming to NAD83 coordinates.
2.2.9
When required by the Chief Building Official, every owner shall uncover and replace at
their own expense any work that has been covered contrary to an order issued by the
Chief Building Official or prior to a field inspection of the work.
2.2.10
Every owner is responsible for the cost of repair of any damage to public property or
works resulting from work carried out pursuant to a permit ordered under the authority
of this bylaw and every applicant for a building permit must provide to the City, as
security for such repairs, the amount set out in the Streets and Traffic Bylaw No. 2233,
2025.
2.2.11
Every owner shall obtain an occupancy permit from the Chief Building Official prior to
City of Langford
Building Bylaw No. 1160, 2008 (Consolidated to June 1, 2026)
Page 9 of 32
any:
(a)
occupancy of a building or part thereof after construction, partial demolition or
alteration of that building; or
(b)
change in the occupancy of any building or part thereof.
2.2.12
The granting of a permit, the review of the drawings and specifications or field reviews
made by the Chief Building Official shall not in any way relieve the owner of a building
from full responsibility for carrying out the work or having it carried out in accordance with
this bylaw and the Building Code, including ensuring that the occupancy of the building,
or any part thereof, is in accordance with the terms of the occupancy permit.
2.2.13
Before an owner obtains a building permit to construct or have constructed a building or
building component that requires professional design and field review according to the
Building Code, Section 2.3 the owner shall deliver to the Chief Building Official Letters of
Assurance in the form set out in the Building Code.
2.2.14
The owner shall ensure that all work covered by this bylaw shall be to an acceptable
standard of good workmanship in performance and appearance.
2.3
ADMINISTRATION AND ENFORCEMENT
2.3.1
The Chief Building Official is authorized to administer and enforce this bylaw and may
prescribe application forms and permit forms required in the administration of this bylaw.
2.3.2
The Chief Building Official may issue, in writing, such notices or orders as may be
necessary to inform the owner and any contractor or other builder that a contravention of
this bylaw or the Building Code has been observed.
2.3.3
The Chief Building Official may order:
(a)
a person who contravenes this bylaw or the Building Code to comply with it
within the period specified;
(b)
work to stop on the building or any part thereof if such work is proceeding in
contravention of this bylaw or the Building Code by placing a "Stop Work" notice
on the work or by written notice;
(c)
the removal of any unauthorized encroachment on public property;
(d)
the removal of any building or part thereof constructed in contravention of this
bylaw or the Building Code;
(e)
the cessation of any occupancy that contravenes this bylaw or the Building
Code, and;
(f)
the cessation of any occupancy if any unsafe condition exists because of work
being undertaken or not completed.
2.3.4
The Chief Building Official may direct that tests and inspections of materials, equipment,
devices, construction methods, structural assemblies or foundation conditions be made,
or sufficient evidence or proof be submitted at the expense of the owner, where such
evidence or proof is necessary to determine whether the material, equipment or device,
construction or foundation condition complies with this bylaw and the Building Code.
2.3.5
In any case where the owner has proposed a method of construction or use of materials
not identified as an “Acceptable Solution” under the Building Code, and the Chief
Building Official considers that the use of the alternative solution affects the operation
and maintenance requirements of the building, the owner may be required to grant to the
City a covenant under s.219 of the Land Title Act requiring the owner to operate and
maintain the building in perpetuity in the manner prescribed in the covenant having
regard to the nature of the alternative solution.
City of Langford
Building Bylaw No. 1160, 2008 (Consolidated to June 1, 2026)
Page 10 of 32
2.3.6.1
Where in the opinion of the Chief Building Official the site conditions, the size or
complexity of a building, part of a building or building component warrant, the Chief
Building Official may require:
(a)
design and field review by a registered professional, and
(b)
that the appropriate Letters of Assurance, Schedules A, B-1, B-2, C-A and C-B
as set out in the Building Code be submitted by the owner.
2.3.6.2
In all cases the following shall require design and field review by a registered
professional:
(a)
buildings that fall within the scope of Part 3 of the Building Code;
(b)
structural components of buildings that fall within the scope of Part 4 of the
Building Code;
(c)
buildings designed with common egress systems for the occupants, or requiring
the use of firewalls according to Div. A Part 1-Subsection 1.3.3.4 of the Building
Code;
(d)
building foundations constructed on fill;
(e)
buildings that are being relocated either to or within the City; and
(f)
building envelope repairs requiring a permit.
2.3.6.3
Design and field review by a registered professional requires compliance with the
requirements of Div.C, Part 2 - 2.2.7 “Professional Design and Review” in the Building
Code.
2.3.7
The Chief Building Official may, at the risk of the owner with conditions to ensure
compliance with this bylaw and the Building Code and any other applicable regulations,
issue a permit to excavate or to construct a foundation of a building before all the plans
of the building have been submitted or accepted by the Chief Building Official.
2.3.8
The Chief Building Official may issue a permit for a building conditional upon the
submission, prior to commencing work, of additional information not available at the time
of issue, if such information is, in the opinion of the Chief Building Official not essential in
determining compliance with this bylaw and the Building Code or is of such a nature that
the withholding of the permit until its availability would delay the work unreasonably.
2.3.9
The Chief Building Official may refuse to issue any permit:
(a)
whenever information submitted is inadequate to determine compliance with the
provisions of this bylaw, the Building Code, or the Zoning Bylaw;
(b)
whenever incorrect information has been submitted,
(c)
that would authorize any building work or occupancy that would not be
permitted by this bylaw, or the Building Code,
(d)
that would authorize any building work that would require a development permit,
until the development permit has been issued; and
(e)
where the proposed work does not comply with the Building Code, a City bylaw,
a restrictive covenant in favour of the City or the Province, or any enactment
respecting health or safety.
2.3.10(1) The Chief Building Official may revoke a permit if:
(a)
there is a contravention of any condition under which the permit was issued;
(b)
construction is at variance with the permit drawings;
(c)
the permit was issued in error; or
(d)
the permit was issued on the basis of incorrect information.
(2) Notice of revocation of a permit shall be served by registered mail addressed to the
owner.
City of Langford
Building Bylaw No. 1160, 2008 (Consolidated to June 1, 2026)
Page 11 of 32
2.3.11
Before issuing an occupancy permit, the Chief Building Official may require the owner to
provide:
(a)
complete as-built drawings for building in pdf file format, floor plate and site
drawings in dwg file format; and
(b)
an electronic version of the “Fire Safety Plan” as approved by the City of
Langford Fire Chief.
2.3.12
If field inspection of the work authorized by a permit shows that it is unsatisfactory, or in
violation of this bylaw, the Chief Building Official may advise the permit holder by written
notice posted on site or by letter. The permit holder shall then perform the alterations,
corrections or replacements as may be necessary and advise the Chief Building Official
when the work is ready for further field review.
2.3.13
Where any failure of a building which causes or has the potential to cause injury or loss
of life occurs during construction authorized by a permit issued under this bylaw, the
Chief Building Official may require the owner to submit a report stating:
(a)
the name and address of the owner of the building;
(b)
the address or location of the building involved in the failure;
(c)
the name and address of the constructor;
(d)
the nature of the failure; and
(e)
the plans to rectify the failure, complete with time parameters.
3.0
PERMITS AND PERMIT FEES
3.1
PERMITS
3.1.1
For the purposes of this Section, a permit means an authorization in writing by the Chief
Building Official to perform work regulated by this bylaw and, in the case of an
occupancy permit, to occupy any building or part thereof.
3.1.2.(1) Except as provided in subsection (2), a Plumbing Permit shall be issued only to a person
holding a current certificate in respect of the plumbing trade issued pursuant to the
Industry Training Authority Act or a permit exempting them from holding such certificate,
or the owner of the property on which the work is to be performed provided they have the
knowledge and ability to perform the work covered by the application in the opinion of the
Chief Building Official.
(2) A permit for the installation of drains and sewers outside a building may be issued to a
sewer, drain, or general contractor.
(3) A permit for the installation of fire sprinklers shall be issued only to a person holding a
current certificate in respect of the sprinkler fitting trade pursuant to the Industry Training
Authority Act or a permit exempting them from holding such certificate.
3.1.3.
Application fees and permit fees shall be as provided for in Appendix “A” of this bylaw.
3.1.4
Where work which requires a permit under this bylaw is commenced prior to obtaining a
permit, the fee shall be doubled in accordance with Appendix “A” of this bylaw.
3.1.5
When an occupancy permit is issued for a tent or air-supported structure, it shall expire
12 months after issue.
3.2
APPLICATION FOR PERMIT
City of Langford
Building Bylaw No. 1160, 2008 (Consolidated to June 1, 2026)
Page 12 of 32
3.2.1
To obtain a permit the owner shall file an application on line through the City of Langford
EPR Portal.
3.2.2
All drawings, plans and specifications shall:
(a)
bear the name, address and telephone number of the designer; and
(b)
contain all design criteria, calculations, and other pertinent information
necessary to verify compliance with this and other bylaws, the Building Code,
and other applicable enactments respecting health and safety.
3.2.3
Except as otherwise allowed by the Chief Building Official, every application shall:
(a)
be signed by the owner;
(b)
state the intended use or uses of the buildings;
(c)
include two sets of drawings for one or two family dwellings and three sets of
drawings for all other projects drawn to a scale of 1:50 (1/4” to 1’-0”) and
showing the following minimum information:
(i)
the dimensions of the building;
(ii)
the proposed use of each room or floor area;
(iii)
a site plan of the land on which the building is, or is to be, situated
complete with building setbacks, proposed driveway parking areas,
retaining walls, easements, rights-of-way, ditches, ponds, water courses,
all trees on site and boulevard with drip lines and details concerning the
depth and extent of any fill on the site or any fill proposed on the site and
slopes greater than 30%;
(iv)
if applicable; acknowledgement by the Vancouver Island Health
Authority that filings required in relation to on-site sewage disposal
systems have been made;
(v)
the method of disposal of storm water;
(vi)
the position, height and horizontal dimensions of all buildings on the land
referred to in Sub-clause (iii) complete with finished grade;
(vii)
when required by the Chief Building Inspector, the grades and elevations
of the streets and sewers abutting the land referred to is Sub-clause (iii);
(viii)
Letters of Assurance by registered professionals as required by the BC
Building Code or this bylaw,
(ix)
when required by the Chief Building Inspector a survey, by a registered
B.C. Land Surveyor, of the building site including existing geodetic
natural grade elevations;
(x)
the technical information specified in this or other bylaws or a restrictive
covenant in favour of the city or the province required to be included on
the drawings; and
(xi)
such other information as is necessary to illustrate all essential features
of the design of the building;
(d)
include in addition for all applications except one or two family dwellings,
accessory buildings to one or two family dwellings or other buildings not
exceeding 600m2 in floor area:
(i)
a plan that shows the location and size of every building drain and of
every trap or inspection piece that is on a building drain;
(ii)
a sectional drawing that shows the size and location of every soil or
waste pipe, trap and vent pipe, fixture loads on stacks and risers; and
(iii)
any and all other information necessary to establish compliance with this
bylaw.
3.2.4
Where an application for a permit has not been completed in conformance with the
requirements of the Chief Building Official or where the permit fee has not been paid
within 6 months after the date of the application, the application shall be cancelled and
any application fee paid shall be forfeited.
City of Langford
Building Bylaw No. 1160, 2008 (Consolidated to June 1, 2026)
Page 13 of 32
3.2.5 (1) A permit shall expire and the right of an owner under the permit shall terminate if:
(a)
the work authorized by the permit is not commenced within 6 months from the
date of issue of the permit;
(b)
work is commenced and then suspended for a period of 6 months; or
(c)
the building has not been completed at the end of a 24-month period following
permit issuance.
(2) A permit may be extended up to 12 months if the extension is requested in writing prior
to the expiration of the permit and the permit extension fee specified in Appendix A is
paid.
(3) In order to complete a project, where a permit has expired, a new permit must be
obtained and new permit fee paid based on the value of the work remaining.
3.2.6
Any application for any revision to the original application shall be made in the same
manner as the original permit. A revision fee in addition to any other applicable fees as
set out in Appendix A shall be paid before any revisions to the original submission will be
processed.
City of Langford
Building Bylaw No. 1160, 2008 (Consolidated to June 1, 2026)
Page 14 of 32
3.3
APPROVAL IN PART
3.3.1
Subject to section 2.3.8, where, in order to expedite work, issuance of a building permit
in respect of a portion of the building is requested prior to the issuance of a permit for the
whole building, application shall be made for the whole building, and complete plans and
specifications covering the portion of the work for which immediate approval is requested
shall be provided with the Chief Building Official.
3.4
PROPERTY SUBJECT TO FLOODING
3.4.1
No permit shall be issued to construct, erect or place a building on land which is
identified in the Official Community Plan as being subject to flooding, except in
accordance with s.524 of the Local Government Act.
3.5
ENERGY CONSERVATION AND GREENHOUSE GAS EMISSION REDUCTION
3.5.1
In relation to the conservation of energy in buildings regulated by Part 9 or Part 3 of the
Building Code, the City incorporates by reference the Energy Step Code in accordance
with the minimum energy performance requirements specified in the Building Code.
3.5.2
In relation to the reduction of greenhouse gas emissions from buildings regulated by
Part 9 of the Building Code, the City incorporates by reference the Zero Carbon Step
Code in accordance with sections 3.5.2(1) and 3.5.2(2) below.
(1)
For building permit applications received on or after July 1, 2026, the building
must be designed and constructed to meet or exceed the requirements of
Emission Level 2 (EL-2) of the Zero Carbon Step Code.
(2)
For building permit applications received on or after December 1, 2026, the
building must be designed and constructed to meet the requirements of
Emission Level 4 (EL-4) of the Zero Carbon Step Code.
3.5.3
In relation to the reduction of greenhouse gas emissions from buildings regulated by
Part 3 of the Building Code, the City incorporates by reference the Zero Carbon Step
Code in accordance with sections 3.5.3(1) and 3.5.3(2) below.
(1)
For building permit applications received on or after December 1, 2026, except
as provided in section 3.5.3(2), the building must be designed and constructed
to meet the requirements of Emission Level 4 (EL-4) of the Zero Carbon Step
Code.
(2)
Where a building meets both of the criteria in sections 3.5.3(2)(a) and
3.5.3(2)(b) below, the building will be considered “in-stream” and therefore
exempt from the requirements in section 3.5.3(1) until May 31, 2027 inclusive,
after which the requirements in section 3.5.3(1) take effect.
(a)
A development permit has been issued prior to June 1, 2026 and is still
valid at the time of building permit application, or a development permit
application is submitted to the City prior to December 1, 2026; and
(b)
A building permit application is submitted on or before May 31, 2027.
3.5.4
For any building subject to a requirement under sections 3.5.1 to 3.5.3:
(1)
An application for a building permit shall include a Pre-Construction Compliance
Report; and
City of Langford
Building Bylaw No. 1160, 2008 (Consolidated to June 1, 2026)
Page 15 of 32
(2)
The owner of the building must submit an As-Built Compliance Report prior to
the issuance of any occupancy permit in respect of the building.
3.5.5
In addition to the requirements in section 3.5.4, the Chief Building Official may request
a Compliance Report at other review stages.
4.0
ADDITIONAL REQUIREMENTS
4.1
PROFESSIONAL INSPECTION OR REVIEW
4.1.1
Any registered professional responsible for conducting field reviews shall, upon request,
make copies of all field review reports available to the Chief Building Official.
4.1.2
Any registered professional responsible for field review of a foundation shall prepare and
sign a report of each review and send it to the Chief Building Official as soon as
practicable.
4.2
INSPECTION AND TESTING OF PLUMBING SYSTEMS
4.2.1
Where a plumbing permit is required, the system shall not be put into use until it has
been reviewed and tested to the satisfaction of the Chief Building Official.
4.2.2
The plumbing contractor shall notify the Chief Building Official when the work is complete
and ready to be reviewed or tested.
4.2.3
The plumbing contractor shall furnish any equipment, material, power or labour that is
necessary for inspection or testing and shall remove the inspection chamber plug, if so
fitted, before the inspection.
4.2.4
If any part of a plumbing system is covered before it has been reviewed and accepted by
the Chief Building Official it shall be uncovered if the Chief Building Official so directs.
4.2.5
If any part of a plumbing system is not accepted by the Chief Building Official after it has
been reviewed or tested, the owner or plumbing contractor shall make any alteration or
replacement that is necessary, and the work shall be subjected to further inspection or
testing.
4.3
EXCAVATIONS
4.3.1
Except where the bottom of the excavation slopes at less than 30% to the underside of
any adjacent structure, utility or property lineThe bylaw continues in the official PDF.