This site is in beta — data may be incomplete and features are still being added.

MeetingsTue, Jul 31, 2018

Special Council

AgendaMinutes

Summary

  • Adopted updated building permit fees and inspection clarifications (Bylaw 1802).
  • Approved reducing interior side setback to 1.5 m at 1900 Bear Mountain Parkway (development variance permit).
  • Adopted zoning amendments renaming Bear Mountain zones and adjusting local rules (Bylaw 1797).

Decisions

What council voted on, in agenda order.

3 decisions
  • Approved reducing the interior side yard setback at 1900 Bear Mountain Parkway to 1.5 m.

    4.a · Application for Development Variance Permit to reduce the interior side yard setback from the required 2.4 to 1.5 m at 1900 Bear Mountain Parkway - Staff Report (Planning)

    Moved by Wade, seconded by Szpak
  • Adopted the zoning amendment for Bear Mountain zones.

    5.a · Bylaw NO. 1797 "Langford Zoning Bylaw, Amendment No. 543, (Revision Bylaw No. 1 - Bear Mountain Zones), 2018" (Adoption)

    Moved by Szpak, seconded by Wade
  • Adopted the building bylaw amendment updating fees.

    5.b · Bylaw NO. 1802 "Langford Building Bylaw No.1160, Amendment No 11, 2018" (Adoption)

    Moved by Wade, seconded by Seaton

Agenda

7 items · select one for details, debate and documents

Summary

Formal opening of the meeting.

call to order

Summary

Council voted to approve the meeting agenda as presented.

Motions (1)

PassedMoved by Councillor W. Sifert

That Council approve the agenda as presented.

agenda approval

Summary

Opportunity for public input (no speakers).

public input
4
Section 4

Summary

Council approved a variance to reduce the interior side yard setback from 2.4 m to 1.5 m at 1900 Bear Mountain Parkway.

Location

1900 Bear Mountain Parkway

Motions (1)

PassedMoved by Councillor R. Wade

That Council proceed with consideration of the following variances for 1900 Bear Mountain Parkway: a) That Section 6.95A.09(1)(c) of Zoning Bylaw No. 300 be varied to reduce the interior side yard setback from the required 2.4 m to 1.5 m.

Documents (1)

Planning staff report recommending consideration of a development variance permit to reduce the interior side yard setback from 2.4 m to 1.5 m for a property at 1900 Bear Mountain Parkway (Finlayson Neighbourhood, Bear Mountain). The report describes background, site data, surrounding uses, covenant requirements, and provides approval/rejection options.

Applicant: Kevin Parker (Draycor Developments Ltd.)Civic address: 1900 Bear Mountain ParkwayProperty size: 16,674 m2Proposal: reduce interior side yard setback from 2.4 m (required) to 1.5 m (proposed)Development Covenant CA5805232 requires interior sprinklers complying with NFPA standards or payment of $2,500 per single family dwelling to the City at building permit stagePrevious related variances: DVP15-0003, DVP15-0004, DVP15-0009 and DP18-0008Recommendation options: (1) Vary Section 6.95A.09(1)(c) of Zoning Bylaw No. 300 to reduce setback to 1.5 m, or (2) Reject the applicationReport date: July 31, 2018
Staff Report to Council

Loading…

Page 2–7
OPTIONS

Loading…

Page 2–7
Appendix A

Loading…

Page 2–7
Appendix B

Loading…

Page 2–7
Appendix C

Loading…

Page 2–7
View full document
variancebear mountainsetback
5
Section 5

Summary

Council adopted Bylaw No. 1797 to amend zoning bylaw terminology and Bear Mountain zone designations.

Motions (1)

PassedMoved by Councillor L. Szpak

That Council adopt Bylaw No. 1797.

Documents (1)

Bylaw to amend Langford Zoning Bylaw No. 300 by renaming and replacing references to Bear Mountain CD6 and CD6A zones with new 'Resort Community of Bear Mountain' zone designations (RCBM1 and RCBM2).

Purpose: replace terms 'CD6'/'CD6A' with 'RCBM1'/'RCBM2' throughout Bylaw No. 300Short title: 'Langford Zoning Bylaw, Amendment No. 543, (Bear Mountain Zones), 2018'Readings: First reading July 16, 2018; Second and Third readings July 30, 2018Adoption date left blank on form (ADOPTED this day of , 2018)
CITY OF LANGFORD

Loading…

Page 8
BYLAW NO. 1797

Loading…

Page 8
View full document
zoningbear mountainbylaw adoption

Summary

Council adopted Bylaw No. 1802 to amend Appendix A (fees) of the Building Bylaw.

Motions (1)

PassedMoved by Councillor R. Wade

That Council adopt Bylaw No. 1802.

Documents (2)

Finance staff report presenting Bylaw No. 1802 (an amendment to the Building Bylaw) as a housekeeping update clarifying fees, and recommending Council adopt the bylaw.

Subject: Bylaw No. 1802 (Building Bylaw No. 1160, Amendment No. 11, 2018)Purpose: housekeeping update to clarify fees (updates to Bylaw No. 1776 referenced)Recommendation: That Council adopt Bylaw No. 1802Report date: July 31, 2018Submitted by: Audrey Kryklywyj-Shortreid
Staff Report to Council - Bylaw No. 1802 Building Bylaw No. 1160, Amendment No. 11, 2018

Loading…

Page 9
View full document

Bylaw amending Building Bylaw No. 1160 by replacing Appendix A with an updated schedule of building, plumbing, chimney, fire protection and other permit fees; includes detailed fee tables and general provisions.

Amendment: replaces Appendix 'A' of Bylaw No. 1160 with updated Appendix A (fee schedule)Short title: 'Langford Building Bylaw No.1160, Amendment No 11, 2018'Readings: First, Second and Third readings all dated July 30, 2018; final adoption date left blankNotable fees: base building permit fee for permits ≤ $1,000: $54.29; graduated fees thereafter ($10.85 per $1,000 up to next $99,000; $8.70 per $1,000 next $900,000; etc)Application fees: $105.52 for construction value ≤ $200,000; $1,055.23 for > $200,000Plumbing fixture fee: $16.39 per fixture; sprinkler system (1–8 heads) $32.57; various other specific fees listed throughout Appendix A
BYLAW NO. 1802 - Langford Building Bylaw No. 1160, Amendment No. 11, 2018

Loading…

Page 10–14
APPENDIX "A”

Loading…

Page 10–14
View full document
building bylawfeesbylaw adoption

Summary

Formal closing of the meeting (meeting adjourned at 5:34 p.m.).

Motions (1)

Outcome not recordedMover not recorded

The Chair adjourned the meeting at 5:34 p.m.

adjournment