DocumentsStaff ReportDec 2, 2024Pages 23–25
Staff Report: DVP24-0005 – 2787 Lakeshore Place – DVP for Frontage Improvements
Application by Grayland Consulting/owner to vary the requirement to construct frontage improvements on Lake End Road as a condition of subdivision to create one new lot at 2787 Lakeshore Place, since access and servicing will be provided from Lakeshore Place.
Key facts
- Civic address: 2787 Lakeshore Place
- Request: variance to Langford Subdivision and Development Servicing Bylaw No.1000 Section 2.4 (frontage works on Lake End Road)
- Justification: access and servicing to be provided from Lakeshore Place; Lake End Road segment closed to vehicle traffic since ~2009, located in 200-year floodplain and over peat with geotechnical issues
- Financial implication: future city upgrade would require capital funds if Council grants variance
Staff Report: DVP24-0005 – 2787 Lakeshore Place – DVP for Frontage Improvements
t 250.478.7882
e administration@langford.ca
2nd Floor, 877 Goldstream Avenue
Langford, BC V9B 2X8
DATE: Tuesday, November 12, 2024
DEPARTMENT: Land Development
APPLICATIO NO.: DVP24-0005
SUBJECT: 2787 Lakeshore Place – DVP for Frontage Improvements
EXECUTIVE SUMMARY
Grayland Consulting, on behalf of the owner of 2787 Lakeshore Place, has applied to vary the requirement to construct frontage improvements on Lake End Road as a condition of subdivision to create one new lot. Frontage improvements and servicing will still be required on Lakeshore Place.
BACKGROUND
2787 Lakeshore Place has road frontage on both Lakeshore Place and Lake End Road.

Figure 1 - 2787 Lakeshore Place
Proposed Subdivision
The Proposed Bare Land Subdivision Plan is configured such that access and servicing will be provided from Lakeshore Place through the common property access. Lake End Road will not be used for access or servicing. As such, the applicant has applied to vary the requirement to construct frontage improvements on Lake End Road as a condition of subdivision to create one new lot.

Figure 2 - Proposed Bare Land Subdivision Plan
COMMENTARY
Langford Subdivision and Development Servicing Bylaw No. 1000 Section 2.4 requires the owner of land to provide works and services on adjacent highways as a condition of subdivision approval. Bylaw 1000 calls for Lake End Road to be constructed to the Small Lot R11 cross section that includes two 4.25 m drive lanes, non-mountable curbs, streetlights and boulevard landscaping including street trees. No Sidewalk is required at this location.
Although not relevant to the variance, for information the City operates a sanitary sewer pump station, the CRD Water Department maintains a 150mm water main, and BC Hydro has overhead three phase power lines within the Lake End Road right of way.

ADDITIONAL CONTEXT
No properties use this portion of Lake End Road for access, and it has been closed to vehicle traffic at Goldstream Avenue since at least 2009. The road is located within the 200-year floodplain and built atop an area known to contain peat, which has significant geotechnical issues such as differential settlement and lateral earth movement. The City has classified Lake End Rd as C - Local, which is the lowest level of maintenance and reserved for roads with very little traffic.
FINANCIAL IMPLICATIONS
Should Council grant this variance, and the City chooses to upgrade the road in the future, capital funds will be required to complete frontage improvements. However, if adjacent lands are redeveloped, the improvements can be made a condition of rezoning, subdivision or building permit.
LEGAL IMPLICATIONS
There are no known legal implications.
OPTIONS
Option 1
THAT the Sustainable Development Advisory Committee recommend that Council direct staff to provide notice that Council will consider issuing a Development Variance Permit to vary Section 2.4 of Langford Subdivision and Development Servicing Bylaw No. 1000 to eliminate the requirement to construct works and services on Lake End Road as a condition of the subdivision of 2787 Lakeshore Place.
OR Option 2
THAT the Sustainable Development Advisory Committee recommend that Council take no action in respect to this application for a Development Variance Permit to vary Section 2.4 of Langford Subdivision and Development Servicing Bylaw No. 1000.
SUBMITTED BY
James Oliver, Senior Land Development Technologist
Concurrence:
- Matthew Baldwin, RPP, MCIP, Director of Development Services
- Melisa Miles, Manager of Legislative Services
- Donna Petrie, Senior Manager of Communications & Economic Development
- Yari Nielsen, Director of Parks, Recreation and Facilities
- Leah Stohmann, RPP, MCIP, Director of Community Planning and Climate Change
- Katelyn Balzer, P.Eng., Director of Engineering and Public Works
- Michael Dillabaugh, CPA, CA, Director of Finance
- Marie Watmough, Director of Legislative & Protective Services
- Braden Hutchins, Deputy Chief Administrative Officer
Attachments: Appendix A – Bare Land Strata Plan