CITY OF LANGFORD SUPPLEMENTARY SPECIFICATIONS; SUPPLEMENTARY SPECIFICATIONS MODIFICATIONS AND ADDITIONS TO THE MMCD SPECIFICATIONS

Contains Langford’s supplementary construction specifications and modifications to MMCD specifications, followed by related standard drawing schedules and drawing sheets. Topics include concrete, waterworks, storm and sanitary sewers, landscaping, and irrigation.

7.3 BYLAW NO. 2158 (Background report attached)

Key facts

  • Includes Schedule 11 supplementary specifications and drawing references
  • Concrete works include a minimum 7-day wet-curing requirement
  • Storm and sanitary sewer inspection and testing requirements are specified
  • Several listed drawings are added, amended, replaced, or deleted by Bylaw No. 2158

City of Langford — Supplementary Specifications

Contents

Section Paragraph Title
01 53 01 – Temporary Facilities
31 23 17 – Rock Removal 1.6 Measurement for Payment
31 23 17 – Rock Removal 1.7 Seismic Survey and Monitoring
31 23 17 – Rock Removal 1.8 Inspection and Testing
32 11 23 – Granular Base 1.4.4 Measurement for Payment
03 30 20 – Concrete Walks, Curbs, and Gutters 2.1.5 (1) Hand-formed and Hand Placed Concrete
03 30 20 – Concrete Walks, Curbs, and Gutters 2.1.5 (2) Extruded Concrete
03 30 20 – Concrete Walks, Curbs, and Gutters 2.1.7 Evaporation Retardant
03 30 20 – Concrete Walks, Curbs, and Gutters 2.1.8 Curing Agent
03 30 20 – Concrete Walks, Curbs, and Gutters 3.4.2 Inspection
03 30 20 – Concrete Walks, Curbs, and Gutters 3.10 Control Joints
03 30 20 – Concrete Walks, Curbs, and Gutters 3.12.1 Finishing
03 30 20 – Concrete Walks, Curbs, and Gutters 3.12.9 Finishing
03 30 20 – Concrete Walks, Curbs, and Gutters 3.14.1 Protection
03 30 20 – Concrete Walks, Curbs, and Gutters 3.15.1 Curing
32 13 13 – Portland Cement Concrete Paving 3.8.16 Concrete Placement
32 13 13 – Portland Cement Concrete Paving 3.10.6 Finishing
32 13 13 – Portland Cement Concrete Paving 3.12.1 Curing
33 11 01 – Waterworks 2.0 Products
33 11 01 – Waterworks 3.0 Execution
33 40 01 – Storm Sewers 3.11.6 Cleaning and Flushing
33 40 01 – Storm Sewers 3.12 Inspection and Testing
33 30 01 – Sanitary Sewers 3.11.6 Cleaning and Flushing
33 30 01 – Sanitary Sewers 3.12 Leakage Testing – General
33 30 01 – Sanitary Sewers 3.18 Video Inspection
33 34 01 – Sewage Force Mains 3.14.4 Cleaning and Flushing

Supplementary Specifications

Page 29–57
Section Subsection Title Supplementary Specifications
01 53 01 – Temporary Facilities Delete This Section
31 23 17 – Rock Removal 1.6 Measurement for Payment Add Clause 1.6.6 which reads: “Payment for trench rock will be by cubic metre. For measurement purposes, the volume of trench rock is defined as that amount below subgrade in areas of mass rock removal or below natural rock surface, extending down to 200 mm below the lowest designed pipe or service invert in the trench and having a width of 450 mm plus the overall external diameter or dimension of the service or services being installed. For two services in common trench this means the width of the two outside diameters, plus the separation between the pipes plus 450 mm. Payment for the excavation of structures shall extend 500 mm from the outside faces of the structure and shall extend to 200 mm below the lowest elevation of the structure.”
31 23 17 – Rock Removal 1.7 Seismic Survey and Monitoring In Paragraph 1.7.1 replace the Phrase “Contract Administrator” with “Contractor”.

In Paragraph 1.7.2 replace the word “Owner” with the word “Contractor”.
32 11 23 – Granular Base 1.4 Measurement for Payment Revise Paragraph 1.4.1 to read: “Limit for payment to be to the face of curb as shown on the Standard Detail Drawings.”
03 30 20 – Concrete Walks, Curbs and Gutters 2.1.5 (1) Hand-formed and Hand Placed Concrete Revise Paragraph 2.1.5 (1) to read: “Hand-formed and hand-placed concrete:
(1) Exposure Classification (CSA A23.1): C2
(2) Minimum Compressive Strength (@ 28 Days): 32 MPa
(3) Maximum Water-Cementing Materials Ratio: 0.45
Nominal Maximum Aggregate Size: 20 mm”
03 30 20 – Concrete Walks, Curbs and Gutters 2.1.5 (2) Extruded Concrete Revise Paragraph 2.1.5 (2) to read: “Extruded concrete:
(1) Exposure Classification (CSA A23.1): C2
(2) Minimum Compressive Strength (@ 28 Days): 32 MPa
(3) Maximum Water-Cementing Materials Ratio: 0.45
Nominal Maximum Aggregate Size: 14 mm or 10 mm”
03 30 20 – Concrete Walks, Curbs and Gutters 2.1.7 Evaporation Retardant Add Clause 2.1.7, which reads: “Evaporation Retardant: Liquid applied, water-diluted, emulsion intended to be applied to plastic concrete to limit moisture loss from the concrete during finishing operations.”
03 30 20 – Concrete Walks, Curbs and Gutters 2.1.8 Curing Agent Add Clause 2.1.8, which reads: “Curing Agent: Liquid applied, membrane forming, curing compound intended for application to concrete following completion of finishing operations. Product shall meet or exceed the requirements of the most recent version of ASTM C309, or as otherwise approved by the City Engineer.”
03 30 20 – Concrete Walks, Curbs and Gutters 3.4.2 Inspection Add Clause 3.4.2, which reads: “Contractor shall review available local weather prediction models to determine if adverse weather conditions are expected during the concrete placement or curing periods. If Hot Weather or Cold Weather conditions, as defined below are expected, the contractor shall have all necessary equipment for protection and curing on site prior to the start of concrete placement.

Hot Weather is defined by the American Concrete Institute (ACI) as: One or a combination of the following conditions that tends to impair the quality of freshly mixed or hardened concrete by accelerating the rate of moisture loss and rate of cement hydration or otherwise causing detrimental results: high ambient temperature; high concrete temperature; low relative humidity; and high wind speed.

Cold Weather is defined by the American Concrete Institute (ACI) as: When air temperature has fallen to, or is expected to fall, below 4°C during the protection period; protection period is defined as the time recommended to prevent concrete from being adversely affected by exposure to cold weather during construction.”
03 30 20 – Concrete Walks, Curbs and Gutters 3.10 Control Joints Revise Paragraph 3.10.1 to read: “In sidewalks only, ‘Zip strip’ to be installed as control joints at maximum 3 m intervals.”
03 30 20 – Concrete Walks, Curbs and Gutters 3.12.1 Finishing Revise Clause 3.12.1 to read: “Commence with finishing operations only once the concrete has achieved initial set. Initial set may be measured on site with a concrete set penetrometer or can be estimated from previous time of set measurements. Time of set estimates shall include allowance for the inclusion of set retarders or hydration stabilizers in the concrete mix. Finish surface of concrete sidewalks and utility strips to smooth surface with magnesium or wood float and brush or broom to provide uniform non-skid surface.”
03 30 20 – Concrete Walks, Curbs and Gutters 3.12.9 Finishing Add Clause 3.12.9 to read: “The contractor shall not add any water to the concrete surface during the finishing process.”
03 30 20 – Concrete Walks, Curbs and Gutters 3.14.1 Protection Revise Clause 3.14.1 to read: “The concrete shall be protected from premature drying with the use of environmental controls, such as windbreaks, shading, or fogging, when rapid surface drying conditions are expected. The contractor shall also use an evaporation retardant to reduce surface moisture loss; however, these products shall be applied per the manufacturer’s written instructions and shall not be used as finishing aids. Protect freshly finished concrete from dust, rain or frost by using tarpaulins or other suitable protective coverings.”
03 30 20 – Concrete Walks, Curbs and Gutters 3.15.1 Curing Revise Clause 3.15.1 to read: “All concrete works shall be wet cured for a minimum of 7-days in conformance with CSA A23.1:24, Table 19, curing regime 3. Allowable curing regimes shall include continuous sprinkling, or saturated lint-free fabric geotextile with polyethylene sheeting covering. Curing shall be installed as soon as final finishing is complete, and the curing system will not mar the surface of the concrete. The curing system shall be continuous throughout the curing period. Alternative curing systems, other than those listed above, shall be submitted to the City for review and approval.”
32 13 13 – Portland Cement Concrete Paving 3.8.16 Concrete Placement Add Clause 3.8.16, which reads: “The concrete shall be protected from premature drying with the use of environmental controls, such as windbreaks, shading, or fogging, when rapid surface drying conditions are expected. The contractor shall also use an evaporation retardant to reduce surface moisture loss; however, these products shall be applied per the manufacturer’s written instructions and shall not be used as finishing aids.”
32 13 13 – Portland Cement Concrete Paving 3.10.6 Finishing Revise Clause 3.10.6 to read: “Commence with finishing operations only once the concrete has achieved initial set. Initial set may be measured on site with a concrete set penetrometer or can be estimated from previously documented time of set measurements for the utilized concrete mix. Time of set estimates shall include allowance for the inclusion of set retarders or hydration stabilizers in the concrete mix. Finish surface of concrete to smooth surface with magnesium or wood float and brush or broom to provide uniform non-skid surface.”
32 13 13 – Portland Cement Concrete Paving 3.12.1 Curing Delete Clause 3.12.1, and replace with: “Complete curing is accordance with Specification Section 03 30 20 – Concrete Walks, Curbs, and Gutters, Clause 3.15 Curing.”
33 11 01 – Waterworks 2.0 Products Delete these sections and replace with (C.R.D. Water Department) Engineering Specifications and Standard Drawings.

Supplementary Specifications — Continued

Page 29–57
Section Subsection Title Supplementary Specifications
33 40 01 – Storm Sewers 3.10 Service Connection Installation Delete the first 2 words of “Where specified,” from Paragraph 3.10.3 to read “Install inspection chambers at, etc.”
33 40 01 – Storm Sewers 3.11 Cleaning and Flushing Revise Paragraph 3.11.6 to read: “Remove foreign material from pipe and related appurtenances by power flushing with water.” Delete the remainder of the Paragraph.
33 40 01 – Storm Sewers 3.12 Inspection and Testing In 3.12.1 replace the phrase “under 900mm in diameter.” with “prior to Acceptance of Works and services and prior to Final Acceptance of works and services.”

Add Clause 3.12.4 which reads: “The Contractor shall carry out power flushing and video inspection of all storm sewers. The results of the inspection shall be delivered to the Contract Administrator at least 14 days prior Acceptance of Works and services and prior to Final Acceptance of works and services. Inspection records shall illustrate flow through the pipe for all design grades less than 2%.”

Add Clause 3.12.5 which reads: “The inspection record shall be in a form acceptable to the City.”

Add Clause 3.12.6 which reads: “Inspection video shall be submitted to the City in electronic format.”
33 30 01 – Sanitary Sewers 3.11 Cleaning and Flushing Revise 3.11.6 to read: “Remove foreign material from pipe and related appurtenances by power flushing with water.” Delete the remainder of the paragraph.
33 30 01 – Sanitary Sewers 3.12 Leakage Testing General The preferred method of leakage testing is the low pressure air test. All other tests will be carried out at the discretion of the Contract Administrator.
33 30 01 – Sanitary Sewers 3.18 Video Inspection Revise Paragraph 3.18.1 replace the phrase “under 900mm in diameter following completion of installation” with “prior to Acceptance of Works and services and prior to Final Acceptance of works and services.”

Add Clause 3.18.3 which reads: “Inspection records shall illustrate flow through the pipe for all design grades less than 2%.”

Add Clause 3.18.4 which reads: “The inspection report shall be in a form acceptable to the City.”

Add Clause 3.18.5 which reads: “Inspections shall be submitted to the City in electronic format.”

Add Clause 3.18.6 which reads: “Prior to the end of the maintenance period, or when directed by the Contract Administrator, the Contractor is to carry out power flushing and video inspection of all mains. The results of the inspection are to be delivered to the Contract Administrator at least 14 days prior to the end of the maintenance period.”
33 34 01 – Sewage Force Mains 3.14 Cleaning and Flushing Revise Paragraph 3.14.4 to read: “Remove foreign material from pipe and related appurtenances by mandrelling or swabbing.”
Page 29–57

Supplementary Specifications — Modifications and Additions to the MMCD Specifications

Drawing No. Title Supplement
B1 Banner Sizes Add this drawing (Bylaw 1669)
C1 Concrete Sidewalk, Infill and Barrier Curb Delete this drawing (Bylaw 1000)
C2 Concrete Sidewalk and Barrier Curb Delete this drawing (Bylaw 1000)
C3 Concrete Sidewalk and Rollover Curb Delete this drawing (Bylaw 1000)
C6 Concrete Median Curb and Interim Curbs Delete this drawing and refer to Drawing No. SS C6 “Curb and Gutter Detail”. (Bylaw 1000)
C8 Wheelchair Ramp for Sidewalk, Infill and Barrier Curb Delete this drawing and refer to Drawing No. SSC8, titled “Sidewalk Ramp (Boulevard Adjacent to Curb)”. (Bylaw 1000)
C9 Wheelchair Ramp for Sidewalk and Barrier Curbs Delete this drawing and refer to Drawing No. SSC9, titled “Sidewalk Ramp (Sidewalk Adjacent to Curb)”. (Bylaw 1000)
C15 Driveway Configurations Replace drawing C15 with new C15 (Bylaw 1574)
E1 Double Headed Streetlight Add this drawing (Bylaw 1000)
E2 Single Head Lumca Prestige Replace with new E2 (Bylaw 2103)
E3 Cyclone Streetlight Replaced with drawing E8 (Bylaw 1618)
E4 Cyclone Streetlight Base Replaced with drawing E9 (Bylaw 1618)
E5 Landscaping Outlet Post Add this drawing (Bylaw 1000)
E6 Waste Receptacle Kiosk Add this drawing (Bylaw 1000)
E7 Cobra Street Light Replaced with drawing E10 (Bylaw 1618)
E8 Langford Post Top Luminaire Amend this drawing (Bylaw 1669)
E9 Langford Post Top Luminaire Service Base Added Bylaw 1618
E10 Cobra Street Lighting Amend this drawing (Bylaw 1669)
G1 General Legend for Contract Drawings Delete this drawing and refer to Contract Drawing Legends. (Bylaw 1000)
G2 Legends for Materials Delete this drawing. (Bylaw 1000)
G3 Legend for Streetlight and Traffic Signal Drawings Delete this drawing and refer to Contract Drawing Legends. (Bylaw 1000)
G4 Utility Trench Amend this drawing (Bylaw 1817)
G5 Pavement Restoration Amend this drawing (Bylaw 1817)
L1(a) Street Tree Planting Detail Replace with new L1(a) (Bylaw 2158)
L2(a) Tree Grate Planting Detail Replace with new L2(a) (Bylaw 2158)
L2(b) Tree Grate Planting Detail Replace with new L2(b) (Bylaw 2158)
L2(c) Tree Grate Installation Detail Replace with new L2(c) (Bylaw 2158)
L2(d) Tree Grate Installation Detail Replace with new L2(d) (Bylaw 2158)
L2(e) Tree Grate Detail Specification Replace with new L2(e) (Bylaw 2103)
L2(fa) Artificial Turf Installation at Boulevard Tree Delete this drawing (Bylaw 2158)
L2(fb) Artificial Turf Installation at Boulevard Tree Delete this drawing (Bylaw 2158)
L2(g) Artificial Turf at Concrete Delete this drawing (Bylaw 2158)
L2(h) Artificial Turf Installation Delete this drawing (Bylaw 2158)
L3(a) Artificial Turf Detail Add this drawing (Bylaw 2158)
L3(b) Artificial Turf Detail Add this drawing (Bylaw 2158)
L3(c) Artificial Turf Detail Add this drawing (Bylaw 2158)
L3(d) Artificial Turf Detail Add this drawing (Bylaw 2158)
L3(e) Artificial Turf Detail Add this drawing (Bylaw 2158)
L4 Median Planting Delete this drawing (Bylaw 2158)
L4(a) Median Planting Detail Replaced with new L4(a) (Bylaw 2158)
L4(b) Median Planting Detail Add this drawing (Bylaw 2103)
L6(a) Sod Installation Detail Add this drawing (Bylaw 2103)
L6(b) Seed Installation Detail Add this drawing (Bylaw 2103)
L7 Split Rail Fence Detail Add this drawing (Bylaw 2103)
P1 Municipal Irrigation Sleeving Detail Replace with new P1 (Bylaw 2103)
P2 Municipal Irrigation Sleeving Detail Replace with new P2 (Bylaw 2103)
P3 Municipal Irrigation Sleeving Detail Replace with new P3 (Bylaw 2103)
P4 Municipal Irrigation Sleeving Detail Replace with new P4 (Bylaw 2103)
P5 Water Connection Replaced with new P5 (Bylaw 2158)
P5(a) Irrigation Detail Add this drawing (Bylaw 2103)
P5(b) Irrigation Detail Add this drawing (Bylaw 2103)
P6 Valve Manifold Add this drawing (Bylaw 1000)
P6(a) Irrigation Detail Add this drawing (Bylaw 2103)
P7 Drip Line Replace with new P7 (Bylaw 1292)
P7(a) Irrigation Detail Add this drawing (Bylaw 2158)
P8(a) Irrigation Detail Add this drawing (Bylaw 2103)
P8(b) Irrigation Detail Add this drawing (Bylaw 2103)
P9 Irrigation Detail Add this drawing (Bylaw 2103)
P10 Irrigation Detail Add this drawing (Bylaw 2103)
P11 Irrigation Detail Replace with new P11 (Bylaw 2158)
P12 Irrigation Detail Replace with new P12 (Bylaw 2158)
P13 Irrigation Detail Add this drawing (Bylaw 2103)
P14 Irrigation Detail Add this drawing (Bylaw 2103)
P15 Irrigation Detail Add this drawing (Bylaw 2103)
RS1 Turn Around Details Amend this drawing (Bylaw 1817)
RS2 Turn Arounds Amend this drawing (Bylaw 1817)
RS3 Temporary Turn Arounds Add this drawing (Bylaw 1000)
RS4 Pedestrian Activated Crosswalk Signals Replace with new RS4 (Bylaw 2103)
RS5 Canada Post Mailbox Pull Out Replace with new RS5 (Bylaw 2103)
S4 Inside Drop Manhole Delete this drawing (Bylaw 1000)
S6 Sewer Cleanout Delete this Drawing and refer to Drawing No. SSS6 “Sewer Cleanout”. (Bylaw 1000)
S9 Inspection Chamber for 100 to 200 Sanitary Sewer Connection Amend this drawing (Bylaw 1817)
S10 Double Catch Basin Add this drawing (Bylaw 1494)
S11 Top Inlet Catch Basin Amend this Drawing (Bylaw 1669)
S15 Driveway Culvert with Concrete Block Endwalls Delete this drawing (Bylaw 1817)
S16 Ditch Inlet Add this Drawing to Standard Detail Drawings under “Storm and Sanitary Sewers” (Bylaw 1000)
S17 Sanitary Force Main Connection Add this drawing (Bylaw 1000)
SD1 Stormwater Control and Treatment Areas Add this drawing (Bylaw 1000)
SD2 Drainage Calculation Sheet Add this drawing (Bylaw 1000)
SD3 Langford Rainfall Intensity-Duration Frequency Curve Add this drawing (Bylaw 1000)
SD4 Lot Development Erosion and Sediment Control Add this drawing (Bylaw 1000)
SD5 Silt Fence Add this drawing (Bylaw 1000)
SD6 Sediment Basin Add this drawing (Bylaw 1000)
SD7 Vertical Seepage Pit Detail Replace with new SD7 (Bylaw 2158)
SD8 Combined Constructed Wetland and Detention Facility Add this drawing (Bylaw 1000)
SD9 Grass Swale Add this drawing (Bylaw 1000)
SD10 Filter Strip Add this drawing (Bylaw 1000)
SD11 Oil/Grit Separator Chamber with External High Flow Bypass Add this drawing (Bylaw 1000)
SD12 Oil/Grit Separator Type 1 Add this drawing (Bylaw 1000)
SD13 Oil/Grit Separator Type 2 Add this drawing (Bylaw 1000)
SD14 Flow Control Manhole Add this drawing (Bylaw 1000)
SD15 Combined Detention for 2 Year Control & Oil/Grit Separator Add this drawing (Bylaw 1000)
SD16 Storage and Outlet Sizing Add this drawing (Bylaw 1000)
SD17 Mortared Rock Headwall Add this drawing (Bylaw 2158)
SD18 Trench Dam Add this drawing (Bylaw 2158)
W1 Fire Hydrant Clearance Specifications Add this drawing (Bylaw 1513)
Page 29–57

Standard Detail Drawings

Irrigation detail P5, Point of Connection Equipment (POC).
Irrigation detail P5, Point of Connection Equipment (POC).
Irrigation detail P7(a), Valves – Irritrol 100P.
Irrigation detail P7(a), Valves – Irritrol 100P.
Irrigation detail P11, Dripline – Shrub Bed Layout.
Irrigation detail P11, Dripline – Shrub Bed Layout.
Irrigation detail P12, Dripline – Tree Layout.
Irrigation detail P12, Dripline – Tree Layout.
Tree planting detail L1(a), Boulevard Tree Offset from Roadway Curb.
Tree planting detail L1(a), Boulevard Tree Offset from Roadway Curb.
Tree grate planting detail L2(a), Tree Grate & Structural Growing Medium Pit.
Tree grate planting detail L2(a), Tree Grate & Structural Growing Medium Pit.
Tree grate planting detail L2(b), plan view of tree grate and structural soil pit.
Tree grate planting detail L2(b), plan view of tree grate and structural soil pit.
Tree grate installation detail L2(c), Within Sidewalks and Plazas (Concrete).
Tree grate installation detail L2(c), Within Sidewalks and Plazas (Concrete).
Tree grate installation detail L2(d), Within Sidewalks and Plazas (Pavers).
Tree grate installation detail L2(d), Within Sidewalks and Plazas (Pavers).
Artificial turf detail L3(a), Within Boulevard c/w Tree (Plan & Cross Section).
Artificial turf detail L3(a), Within Boulevard c/w Tree (Plan & Cross Section).
Artificial turf detail L3(b), Within Boulevard c/w Tree (Cross Sections).
Artificial turf detail L3(b), Within Boulevard c/w Tree (Cross Sections).
Artificial turf detail L3(c), Within Boulevard c/w Tree (Installation Notes).
Artificial turf detail L3(c), Within Boulevard c/w Tree (Installation Notes).
Artificial turf detail L3(d), Within Boulevard Between Curb and Sidewalk.
Artificial turf detail L3(d), Within Boulevard Between Curb and Sidewalk.
Artificial turf installation detail L3(e), Planting in Minimum 3.5m Center Median.
Artificial turf installation detail L3(e), Planting in Minimum 3.5m Center Median.
Median planting detail L4(a), c/w 450mm Wide Concrete Safety Edger.
Median planting detail L4(a), c/w 450mm Wide Concrete Safety Edger.
Vertical seepage pit detail SD-7.
Vertical seepage pit detail SD-7.
Mortared rock headwall detail SD-17.
Mortared rock headwall detail SD-17.
Trench dam detail SD-18.
Trench dam detail SD-18.
Page 29–57
Extracted from: Attachment 1 - Proposed Subdivision and Development Servicing Bylaw, Amendment No. 28, Bylaw No. 2158, 2026