DocumentsStaff ReportApr 15, 2019Pages 26–28
Staff Report: Irwin Road Trail Infill
Engineering staff report proposing realignment of Irwin Road to install a 3.0 m asphalt trail between Meridian and 2955 Irwin, with estimated cost of $60,000 funded from Road DCCs.
Key facts
- Estimated cost: $60,000 for design and construction
- Scope: 3.0 m asphalt trail, road realignment, new crosswalk and pedestrian landing at Meridian
- Funding source: Road Development Cost Charges (DCCs)
Staff Report: Irwin Road Trail Infill
2nd Floor · 877 Goldstream Avenue · Langford, BC Canada · V9B 2X8
T · 250-478-7882 F · 250-478-7864
Date:
April 9, 2019
Department:
Engineering
Subject:
Irwin Road Trail Infill
Background
As part of frontage improvements for the development being constructed at 2955 Irwin Road, a three meter asphalt trail is being installed, which will allow for further trail connection to the west. This leaves an approximately 60 m section on Irwin between Meridian and this development without a trail.
Commentary
The development has utilities being installed from Meridian to the development. As part of this work there will be some curb and pavement removal and reinstatement at the intersection. With the current works there may be an opportunity to engage the same contractor to realign the current road to allow for the continuation of the three meter asphalt trail. This would allow the trail to be completed from Meridian to the east end of 2955 Irwin.
Legal Implication
None.
Financial Implications
The works proposed in this report are as follows:
Estimated costs are $60,000.00 for design and construction of the 3.0m asphalt trail connection, road realignment and new crosswalk to be paid from Road DCC’s
Once design is completed a quote will be obtained from the contractor performing the other works, if the quote falls within the $60,000.000 with the design a PO will be issued to have the work completed at the same time
Options
That the Transportation and Public Works Committee recommend that Council:
- Proceed with the design and installation of the realignment of Irwin Road to allow for the installation of a 3.0m asphalt trail from Meridian to 2955 Irwin. This would include installing a new crosswalk and pedestrian landing on Irwin Road at Meridian, at a total estimated cost of $60,000 to be funded from Road DCC’s.
OR
2. Do nothing at this time.
Respectfully submitted,
Submitted by:
Raphiel Mattson, AScT, Senior Engineering Technologist
Concurrence:
Michelle Mahovlich, P.Eng, P.Geo, Director of Engineering
Concurrence:
George Henshall, AScT, Deputy Director of Engineering & Public Works
Concurrence:
Ivan Leung, P.Eng, Manager of Engineering Construction
Concurrence:
Michael Dillabaugh, CPA, CA, Director of Finance
Concurrence:
Braden Hutchins, Director of Corporate Services
Concurrence:
Darren Kiedyk, Chief Administrative Officer
:RM